The infrastructure of the LINTE^2 Laboratory includes the following main components:

  1. electrical power devices (generation, transmission and reception units, energy storage, charging stations for electric vehicles, etc.) equipped with advanced computer control; these devices are hardware and functionally connected in the so-called functional units (currently there are 30 such units),
  2. complex configuration switchgear enabling the compilation of functional units into various networks and power systems (including generation and transmission nodes, microsystems, clusters, virtual power plants, etc.),
  3. distributed control system based on Ethernet communication network including local controllers of functional units, digital protection relays and 9 control rooms with operator and engineering stations.